HOW WE ENGAGE

A Disciplined, Milestone-Gated Engineering Pathway

No open-ended time-and-materials billing. We execute across tightly bounded, milestone-gated phases with transparent prerequisites, clear technical criteria, and zero operational surprises.

TYPICAL TIMELINE

The 5-Phase Implementation Pathway

From the initial 3-week readiness diagnostic to on-site commissioning, GxP validation, and operational staff handover.

ENGAGEMENT LIFECYCLE

Assess • Architect • Build • Deploy • Operate

Milestone-Gated • Zero Fluff
ASSESSWeeks 1–3

Data Diagnostic & Audit

→ Readiness Report & Hardware Sizing
  • •Audit of ERP / MES / LIMS schemas
  • •PDF repository heterogeneity sampling
  • •Regulatory constraints mapping (Part 11)
  • •Preliminary GPU VRAM & server sizing
FASE 01
ARCHITECTWeeks 4–6

Architecture & Model Selection

→ Air-Gap Network Topology & BOM
  • •Open-weight model benchmark & selection
  • •Dual-NIC physical network topology
  • •Vector database & metadata schema design
  • •Hardware procurement Bill of Materials (BOM)
FASE 02
BUILDWeeks 7–11

Agent Swarms & PDF Ingestion

→ Trained Agents & OCR Pipelines
  • •High-throughput PDF ingestion & spatial OCR
  • •Specialized domain agent prompt engineering
  • •Read-only parameterized SQL ERP connectors
  • •Deterministic citation verification engine
FASE 03
DEPLOYWeeks 12–14

On-Site Commissioning & Air-Gap

→ Turnkey On-Site System & Handover
  • •Physical server racking & burn-in testing
  • •Kernel-level network isolation validation
  • •21 CFR Part 11 audit trail ledger sign-off
  • •Staff training & operational SOP handover
FASE 04
OPERATEOngoing Retainer

Managed Operations & SLAs

→ Continuous Evaluation & Retainers
  • •Monthly model drift & accuracy benchmarking
  • •Periodic local retraining on new SOP revisions
  • •Secure offline updates for model checkpoints
  • •Hardware spare hot-swaps & 4-hour SLA
FASE 05✓ PROD
CLIENT PREREQUISITES

What Your Organization Needs to Provide

To guarantee project velocity and eliminate bottlenecks, successful deployments require four specific commitments from your internal team.

01

Representative Data & Schema Access

Authorized read access to representative data samples, schema definitions (SAP/MES/LIMS), and historical PDF archives (SOPs, batch records, CoAs) for data profiling.

02

Designated Technical & IT Liaison

An assigned internal systems or infrastructure engineer with authority to coordinate local network topology, VLAN assignments, and server rack provisioning.

03

Physical Server Rack & Power Provisioning

4U of standard 19" rack space, dual redundant 20A power circuits with UPS backup, and facility cooling capable of supporting 1.5 kW continuous thermal dissipation.

04

Quality Assurance & Regulatory Sponsor

A designated quality officer or regulatory compliance lead to define formal validation acceptance criteria, review audit trail protocols, and sign off on IQ/OQ/PQ stages.

COMMERCIAL MODEL

Pricing Structure & Engagement Terms

We do not sell metered cloud tokens or bill mysterious SaaS markups. Our work is delivered through three transparent, predictable commercial vehicles.

01. FIXED-SCOPE ASSESSMENT3 Weeks

Data Readiness & Architecture Diagnostic

SCOPE OF WORK

Comprehensive data schema audit, PDF repository heterogeneity sampling, air-gap network topology design, and formal hardware procurement Bill of Materials.

FORMAL DELIVERABLES

→ Turnkey Feasibility Report, Silicon Sizing Specification, and Agent Blueprint

Fixed-fee milestone • Credited against project build upon deployment commitment
02. MILESTONE PROJECT BUILD8 to 12 Weeks

Turnkey Agent Build & On-Premise Deployment

SCOPE OF WORK

End-to-end multi-agent swarm development, high-throughput spatial OCR ingestion over 50,000+ PDFs, read-only ERP bridges, on-site hardware racking, and GxP validation.

FORMAL DELIVERABLES

→ Turnkey Production System, Infrastructure as Code, and Validated IQ/OQ/PQ Sign-Off

Milestone-gated progress payments tied to verifiable technical deliverables
03. MANAGED OPERATIONS RETAINERAnnual Retainer

Ongoing Evaluation & SLA Retainer

SCOPE OF WORK

Monthly accuracy evaluation against golden benchmark datasets, incremental local retraining on new SOP revisions, model checkpoint upgrades, and 4-hour hot-swap SLA.

FORMAL DELIVERABLES

→ Continuous Model Maintenance, Quarterly Validation Audits, and Hot-Swap Coverage

Predictable monthly retainer • Zero variable consumption or token surcharges

Begin with an Initial Technical Diagnostic

Contact our team to execute a mutual NDA and schedule an initial technical scoping session with our lead architects.